British Columbia

Team chosen to design 8-lane replacement for B.C.'s Massey Tunnel

A team has been selected to design a new eight-lane tunnel to replace the aging George Massey Tunnel under the Fraser River in Metro Vancouver.

Transportation Minister Rob Fleming says the selection means design plans can now be finalized

Cars driving into a tunnel
Traffic passing through the George Massey tunnel on Highway 99 in British Columbia's Lower Mainland. (Frederic Gagnon/CBC)

A team has been selected to design a new eight-lane tunnel to replace the aging George Massey Tunnel under the Fraser River in Metro Vancouver, with British Columbia's transportation minister calling it a "huge step" for the project.

Rob Fleming says the selection of the preferred proponent for the tunnel project, Cross Fraser Partnership, means design plans can now be finalized on the project. The replacement was expected to cost $4.15 billion when it was first announced, and the ministry told CBC News Tuesday that this estimate remains the same. 

A statement from Fleming's ministry says the proponent will build on extensive design work the province has already completed, working toward a final design and construction agreement that considers the risks and costs of the massive project.

The ministry says the new toll-free tunnel will have three general-purpose lanes, and one dedicated lane for public transit, in each direction — for a total of eight lanes.

It says the new tunnel will also feature a separate multi-use path for people walking, biking or using other modes of transportation to make the crossing.

Dan Coulter, the minister of state for infrastructure and transit, says it will be the first time at that location that people will be able to cross the river by foot or bike.

The province adds that environmental assessment is continuing alongside the development of the project design, with major construction starting in 2026.

WATCH | Political panel debates Massey Tunnel replacement project: 

Political panel debates Massey Tunnel replacement project

9 months ago
Duration 4:27
The province is expected to choose a design-build team this spring in the next step of the multibillion-dollar project to replace the Massey Tunnel connecting Delta and Richmond. We spoke to members of each provincial political party about their position on the expensive infrastructure project.

The Cross Fraser team includes Bouygues Construction Canada, Fomento de Construcciones y Contratas Canada Ltd., Pomerleau B.C. and Arcadis Canada.

The project has long been a political friction point, with the former B.C. Liberal government announcing in 2013 that it would replace the tunnel with a 10-lane bridge.

But the NDP cancelled that proposal shortly after taking office in 2017, prompting a long dispute over how the project should proceed.

With files from Meera Bains